Minimasi Waste Pada Aktivitas Proses Produksi Dengan Konsep Lean Manufacturing (Studi Kasus di PT. Sport Glove Indonesia) T Ristyowati, A Muhsin, PP Nurani Opsi 10 (1), 85-96, 2017 | 124 | 2017 |
Penjadwalan Proyek dengan Penerapan Simulasi Monte Carlo pada Metode Program Evaluation Review and Technique (PERT) WN Shofa, I Soejanto, T Ristyowati Opsi 10 (2), 150-157, 2017 | 20 | 2017 |
Analisis Beban Kerja Fisiologis sebagai Dasar Penentuan Waktu Istirahat untuk Mengurangi Kelelahan Kerja W Hidayat, T Ristyowati, GM Putro Opsi 13 (1), 62-69, 2020 | 18 | 2020 |
Perancangan Sistem Kerja untuk Meningkatkan Hasil Produksi melalui Pendekatan Macroergonomic Analysis And Design di Sentra Industri Batik Ayu Arimbi Sleman T Ristyowati, T Wibawa Opsi 11 (2), 125-133, 2018 | 10 | 2018 |
Identifikasi Masalah Pada Mesin Raw Mill Menggunakan Metode Fmea Dan Rpn C Novita, YD Astanti, T Ristyowati Waluyo Jatmiko Proceeding 15 (1), 57-62, 2022 | 1 | 2022 |
Determining the Number of Operators based on Workload Analysis FG Wijayadi, T Ristyowati, E Nursubiyantoro | 1 | 2022 |
Pengembangan Model Simulasi Sistem Dinamis Keseimbangan Jumlah Input-Output Mahasiswa Y Dwi Astanti, T Ristyowati Jurnal OPSI FTI UPN" Veteran" Yogyakarta 9 (1), 69-75, 2016 | 1 | 2016 |
PERANCANGAN FASILITAS KERJA UNTUK MENINGKATKAN EFISIENSI KERJA DENGAN ANALISIS RAPID ENTIRE BODYASSESSMENT (REBA) T Ristyowati Semantik 2011 1 (1), 2011 | 1 | 2011 |
A Proposed Strategy to Reduce Worker Fatigue in a Continuous Manufacturing System Considering Work Stress, Self-Efficacy, and Sleepiness: A Case Study of a PVC Pipe Manufacturer N Prangawayu, N Indrianti, T Ristyowati | | 2022 |
RECOVERY ENGINEERING OF EX-ILLEGAL SAND AND STONE MINING ON THE SLOPES OF MOUNT MERAPI J Purwanta, S Suharwanto, T Ristyowati International Journal of Civil Engineering and Technology (IJCIET) 12 (8), 67-73, 2021 | | 2021 |
Mitigation of Environmental Damage in the Cangkringan Area, Sleman Regency J Purwanta, S Suharwanto, T Ristyowati | | 2021 |
PENINGKATAN PRODUKTIVITAS BERDASARKAN EVALUASI LINGKUNGAN KERJA FISIK MENGGUNAKAN METODE ERGONOMIC CHECKPOINTS H Solikah, T Ristyowati | | 2020 |
PEMILIHAN SUPPLIER KULIT MENGGUNAKAN VENDOR PERFORMANCE INDICATOR (VPI) DAN ANALYTICAL HIERARCHY PROCESS (AHP) RD Fhadjrin, I Soejanto, T Ristyowati | | 2020 |
Increased efficiency dust catcher equipment manufacturing method of Fogging in andesite J Purwanta, Suharwanto, T Ristyowati AIP Conference Proceedings 2296 (1), 020080, 2020 | | 2020 |
Application of An Environmental Friendly Work Area At Dinda Hayu Batik J Purwanta, Y Siswanti, T Ristyowati Proceeding of LPPM UPN “Veteran” Yogyakarta Conference Series 2020 …, 2020 | | 2020 |
Alternative Environmental Management in The Split Making Industry J Purwanta, S Suharwanto, T Ristyowati Proceeding of LPPM UPN “Veteran” Yogyakarta Conference Series 2020 …, 2020 | | 2020 |
Enhancing engineering the groundwater reserves an environmental of life J Purwanta, Suharwanto, T Ristyowati AIP Conference Proceedings 2245 (1), 030003, 2020 | | 2020 |
DUST CONTROL ON ANDESITE STONE PROCESSING INDUSTRY J Purwanta, S Suharwanto, T Ristyowati International Journal of Civil Engineering and Technology (IJCIET) 11 (2 …, 2020 | | 2020 |
Perencanaan Proyek Konstruksi untuk Meminimasi Waste dalam Rangka Meningkatkan Efisiensi Sumberdaya Menggunakan Metode Lean Construction dan CCPM T Ristyowati, L Nafisah PROSIDING SEMINAR NASIONAL TAHUN KE-2 CALL FOR PAPERS DAN PAMERAN HASIL …, 2016 | | 2016 |
Implementasi Permainan sebagai Sarana Peningkatan Pemahaman Mahasiswa dalam Pembelajaran Matakuliah di Jurusan Teknik Industri Y DWI ASTANTI, T Ristyowati Seminar on Application and Research in Industrial Technology, SMART in …, 2013 | | 2013 |