Follow
Wendi Boy
Wendi Boy
Universitas Dharma Andalas Padang
Verified email at unidha.ac.id
Title
Cited by
Cited by
Year
Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Gedung Kuliah Pada Masa Pandemi Covid 19
W Boy, R Erlindo, RA Fitrah
Jurnal Rivet 1 (01), 57-64, 2021
382021
PENGARUH MOTIVASI KERJA, KEPEMIMPINAN DAN BUDAYA ORGANISASI TERHADAP KEPUASAN KERJA KARYAWAN SERTA DAMPAKNYA PADA KINERJA PERUSAHAAN (STUDI KASUS PADA PT. BUMP KOTA SOLOK)
G Vanli
Universitas Putra Indonesia" YPTK" Padang, 2019
132019
Detection and Extraction of Brain Hemorrhage on the CT-Scan Image using Hybrid Thresholding Method
S Sumijan, Y Yuhandri, W Boy
Journal of Computer Science and Information Technology 1 (1), 10-19, 2016
122016
Risk assestment of housing reconstruction project community-based construction after the earthquake
W Boy, R Imani, M Chari, W Purba, J Melasari
Journal of Physics: Conference Series 1339 (1), 012001, 2019
92019
Correlation between type of ground-based on b-value and the impact on buildings due to Sumatra earthquakes
R Imani, UD Arman, W Boy
MATEC Web of Conferences 229, 02013, 2018
92018
Suripin, & Wibowo, MA (2017). Construction risk management model of housing reconstruction basing the community after earthquake disaster
W Boy
International Journal of Civil Engineering and Technology 8 (10), 1220-1236, 0
8*
Analisis Faktor Penyebab Keterlambatan Pelaksanaan Proyek Rehabilitasi Sekolah Dalam Masa Pandemi Covid-19
G Vitri, W Boy, WP Zayu
Racic: Rab Construction Research 5 (2), 65-74, 2020
62020
ANALISIS MANAJEMEN RISIKO TERHADAP ASPEK KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN DAERAH IRIGASI (LANJUTAN) DI TARUSAN PADA TITIK P-52 DAN P-92
W Boy, RA Fitrah
Jurnal Rivet 1 (02), 91-98, 2021
52021
Hybrid thresholding method in detection and extraction of brain hemorrhage on the ct-scan image
S Sumijan, Y Yuhandri, W Boy
Journal of Computer Scine and Information Technology, 7-14, 2021
42021
Assessment for Seismic Activities in Pesisir Selatan West Sumatra in 2018
R Imani, W Boy, U Dewi, A Sari, W Purba, M Chairi, J Melasari
Journal of Physics: Conference Series 1339 (1), 012003, 2019
22019
Diseminasi Kesehatan dan Keselamatan Kerja pada Workshop Konstruksi di SMK N 1 Sumbar
BB Irawan, W Boy, DI Mazni, OD Saputri
Jurnal Pengabdian Masyarakat Dharma Andalas 1 (2), 51-57, 2023
12023
Property development risk management process model
IW Muka, W Boy
IOP Conference Series: Earth and Environmental Science 708 (1), 012060, 2021
12021
Identification of constraint factors on the contract quality plan for the Batang Kuranji sediment control development project, Padang City
W Boy, R Imani, NT Noviani
IOP Conference Series: Earth and Environmental Science 708 (1), 012091, 2021
12021
THE APPLICATION OF VALUE ENGINEERING IN SOIL IMPROVEMENT (PROJECT OF PELINDO III TELUK LAMONG SURABAYA)
W Boy, MA Wibowo, M Huda
International journal of sustainable building, infrastructure and …, 2020
12020
EFFECT OF SHEAR WALL ON BUILDING STRUCTURE RESPONS
W Boy, R Imani, R Jaya
Construction and Material Journal 1 (2), 151-164, 2019
12019
Optimalisasi Perencanaan Pondasi Rakit pada Bangunan Pendidikan Tinggi
HA Muchti, DI Mazni, H Herman, W Boy
Jurnal Bangunan, Konstruksi & Desain 2 (4), 262-272, 2024
2024
Review of occupational health and safety (OHS) application at the construction workshop in Padang city
BB Irawan, W Boy, DI Mazni, D Daoed, A Roza
AIP Conference Proceedings 2891 (1), 2024
2024
The effect of Covid-19 pandemic on the risk of construction work in Indonesia
W Boy, DI Mazni, G Vitri, G Rahman
AIP Conference Proceedings 2891 (1), 2024
2024
Sosialisasi Penerapan Peraturan K3 (Keselamatan dan Kesehatan Kerja) Pada Siswa SMA di Kabupaten Solok Selatan Sumatera Barat
W Boy, H Herman, BB Irawan, DI Mazni, G Vitri, WP Zayu, D Wahyudi, ...
Jurnal Pengabdian Masyarakat Dharma Andalas 2 (2), 137-142, 2024
2024
Sistem Mitigasi Dan Adaptasi Bencana Dalam Menghadapi Potensi Acaman Mentawai Megathrust Sebagai Inovasi Teknologi Edukasi Kebencanaan
P Anggraini, W Boy, S Sularno
Jurnal Teknologi Dan Sistem Informasi Bisnis 6 (1), 125-134, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20