Krishna Suryanto Pribadi
Title
Cited by
Cited by
Year
Factors relating to labor productivity affecting the project schedule performance in Indonesia
A Soekiman, KS Pribadi, BW Soemardi, RD Wirahadikusumah
Procedia engineering 14, 865-873, 2011
1322011
dkk. 2008
KS Pribadi
Pendidikan Siaga Bencana. Bandung: Institusi Tehnologi Bandung, 0
29
Post-disaster housing reconstruction in Indonesia: Review and lessons from Aceh, Yogyakarta, West Java and West Sumatera earthquakes
KS Pribadi, D Kusumastuti, SAH Sagala, R Wimbardana
Disaster Recovery, 197-223, 2014
232014
Licensing construction workforce: Indonesia's effort on improving the quality of national construction industry
RD Wirahadikusumah, KS Pribadi
Engineering, Construction and Architectural Management, 2011
202011
Experimental study on wall-frame connection of confined masonry wall
W Wijaya, D Kusumastuti, M Suarjana, K Pribadi
Procedia engineering 14, 2094-2102, 2011
202011
Learning from recent Indonesian earthquakes: An overview to improve structural performance
KS Pribadi, DK Rildova
14th World Conference on Earthquake Engineering, Beijing, China, 2008
202008
Assessing risk management capability of public sector organizations related to PPP scheme development for water supply in Indonesia
MH Pangeran, KS Pribadi, RD Wirahadikusumah, S Notodarmojo
Civil Engineering Dimension 14 (1), 26-35, 2012
142012
Pendidikan Siaga Bencana Gempa Bumi Sebagai Upaya Meningkatkan Keselamatan Siswa (Studi Kasus Pada SDN Cirateun dan SDN Padasuka 2 Kabupaten Bandung)
KS Pribadi, AK Yuliawati
KRISHNA_S_PRIBADI_-_ITB. pdf, 2008
132008
A proposal for a comprehensive approach to safer non-engineered houses
T Narafu, Y Ishiyama, K Okazaki, S Ando, H Imai, KS Pribadi, AM Dixit, ...
Journal of Asian Architecture and Building Engineering 9 (2), 315-322, 2010
122010
Important risks on public private partnership scheme in water supply investment in Indonesia
KS Pribadi, MH Pangeran
Proc., 1st Int. Conf. of European Asian Civil Engineering Forum, 2007
112007
The Bhuj Earthquake of January 2001
R Shaw, R Sinha, A Goyal, J Saita, H Arai, M Choudhury, K Jaiswal, ...
IITEDM Joint Reconnaissance Report, 2001
112001
Model Penilaian Keberhasilan Transfer of Knowledge pada Joint Operation antara Perusahaan Jasa Konstruksi Asing dan Perusahaan Jasa Konstruksi Lokal
A Jayady, KS Pribadi, M Abduh, SN Bahagia
Disertasi Doktor, Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi …, 2017
102017
Comparison of current construction practices of non-engineered buildings in developing countries
K Okazaki, K Pribadi, D Kusumastuti, T Saito
Fifthteenth world conference on earthquake engineering, Lisbon, 2012
102012
Study on factors affecting project level productivity in Indonesia
A Soekiman, KS Pribadi, BW Soemardi, RD Wirahadikusumah
Annals of the Faculty of Engineering Hunedoara 9 (3), 35, 2011
102011
Assessing Readiness of Public Sector Risk Management for PPP in Infrastructure Development in Indonesia
K Pribadi, MH Pangeran
Second International Conference on Construction in Developing Countries …, 2010
102010
Identifikasi Faktor Dominan Penyebab Kerentanan Bangunan Di Daerah Rawan Gempa, Provinsi Sumatera Barat
MH Zulfiar, T Tamin, KS Pribadi, I Irwan
Semesta Teknika 17 (2), 116-125, 2014
82014
The construction sector of Indonesia
A Widjajanto, KS Pribadi, A Suraji
17th Asia Construct Conference, New Delhi, India, 2011
82011
Conceptual model of analytical network process for prioritizing risk in a PPP infrastructure project
MH Pangeran, KS Pribadi
Proceedings of the First Makassar International Conference on Civil …, 2010
82010
Challenges in implementing the public sector comparator for bid evaluation of PPP’s infrastructure project investment
MH Pangeran, RD Wirahadikusumah
Proceedings of the first Makassar International Conference on Civil …, 2010
82010
Perkembangan Joint Operation di Indonesia
A Jayady, KS Pribadi, M Abduh, SN Bahagia
Prosiding: Seminar Nasional Teknik Sipil IX, Institut Teknologi Sepuluh …, 2013
72013
The system can't perform the operation now. Try again later.
Articles 1–20