Robust parameter design based on back propagation neural network TR Arungpadang, YJ Kim Korean Management Science Review 29 (3), 81-89, 2012 | 14 | 2012 |
A Study on Dual Response Approach Combining Neural Network and Genetic Algorithm TR Arungpadang, YJ Kim Journal of Korean Institute of Industrial Engineers 39 (5), 361-366, 2013 | 8 | 2013 |
Aplikasi Metode Elemen Hingga Pada Perancangan Poros Belakang Gokar Listrik HH Sigarlaki, S Tangkuman, TAR Arungpadang JURNAL POROS TEKNIK MESIN UNSRAT 4 (2), 2015 | 7 | 2015 |
Mekanika Kekuatan Material S Tangkuman, TAR ARUNGPADANG Program Studi S1 Teknik Mesin Universitas Sam Ratulangi. Manado, 2014 | 7 | 2014 |
Analisis Kelelahan Axle Shaft Truk Isuzu Elf 125 Ps R Wahab, S Tangkuman, TAR Arungpadang JURNAL POROS TEKNIK MESIN UNSRAT 6 (2), 2017 | 6 | 2017 |
Simulasi Proses Bongkar Muat Peti Kemas TAR Arungpadang, AF Hipan Jurnal Tekno Mesin 2 (2), 2015 | 6 | 2015 |
Analisis Kekuatan Poros Landing Gear Pesawat N-219 N Malendes, S Tangkuman, T Arungpadang JURNAL POROS TEKNIK MESIN UNSRAT 5 (2), 2016 | 4 | 2016 |
Prediksi Kebutuhan Energi Listrik Di Sulawesi Utara: Sebuah Strategi Implementasi R Lumintang, T Arungpadang, CC Punuhsingon JURNAL POROS TEKNIK MESIN UNSRAT 7 (1), 2018 | 3 | 2018 |
SIMULASI SISTEM MANUFAKTUR Studi Kasus: Proses Produksi Brake Drum Coupling TAR Arungpadang Jurnal Tekno Mesin 1 (3), 2015 | 3 | 2015 |
인공신경망과 유전알고리즘 기반의 쌍대반응표면분석에 관한 연구 김영진 대한산업공학회지 39 (5), 361-366, 2013 | 3 | 2013 |
Analisis Kebutuhan Energi Listrik dengan Jaringan Syaraf Tiruan TAR Arungpadang, FA Hontong, L Tarigan Jurnal Tekno Mesin 4 (2), 2021 | 2 | 2021 |
Analisis Tata Letak Fasilitas Tempat Pembuangan Akhir (Tpa) Mobongo Dengan Sistem Controlled Landfill Di Minahasa Selatan JPBA Jehosua, TAR Arungpadang, J Mende Jurnal Tekno Mesin 7 (1), 8-13, 2021 | 2 | 2021 |
Prediction of Electricity Demand by Using Smoothing Method and Artificial Intelligence (Case Study: SulutGo System) T Arungpadang, L Patras, J Neyland Proceedings of The 2th International Multidisciplinary Conference 2016 1 (1), 2017 | 2 | 2017 |
Estimasi Beban Puncak Energi Listrik Pada Sistem Sulutgo Menggunakan Artificial Neural Network Dan Metode Moving Average L Tarigan, T Arungpadang, JSC Neyland JURNAL POROS TEKNIK MESIN UNSRAT 5 (2), 2016 | 2 | 2016 |
Perancangan Rotor Turbin Angin Savonius Tipe-L Untuk Pembangkit Listrik Pada Rumah Tinggal W Junior, S Tangkuman, T Arungpadang JURNAL POROS TEKNIK MESIN UNSRAT 11 (1), 2022 | 1 | 2022 |
Analisis Komposisi Kimia Plat Rantai Yamaha MX 135 Menggunakan Energy Dispersive X-Ray Spectroscopy MK Umboh, TAR Arungpadang, B Davidson Jurnal Tekno Mesin 7 (1), 30-34, 2021 | 1 | 2021 |
Dual Response Approach in Process Capability based on Hybrid Neural Network-Genetic Algorithms TAR Arungpadang, S Tangkuman, LS Patras Journal of Sustainable Engineering: Proceedings Series 1 (1), 117-122, 2019 | 1 | 2019 |
Analisa Swot pada Pembelajaran Kimia dalam Bidang Teknik Mesin TAR Arungpadang, J Longdong, LS Patras Jurnal Tekno Mesin 5 (1), 2018 | 1 | 2018 |
Development of dual response approach using artificial intelligence for robust parameter design TA Arungpadang, BL Maluegha, LS Patras Proceedings of the 1st Ahmad Dahlan International Conference on Mathematics …, 2017 | 1 | 2017 |
Prediksi Kebutuhan Energi Listrik Sulawesi Utara Menggunakan Artificial Neural Network Dan Metode Exponential Smoothing FA Hontong, T Arungpadang, JSC Neyland JURNAL POROS TEKNIK MESIN UNSRAT 5 (2), 2016 | 1 | 2016 |