Follow
Photios G. Ioannou
Photios G. Ioannou
University of Michigan
No verified email
Title
Cited by
Cited by
Year
Scheduling projects with repeating activities
RB Harris, PG Ioannou
Journal of construction engineering and management 124 (4), 269-278, 1998
4721998
General-purpose systems for effective construction simulation
JC Martinez, PG Ioannou
Journal of construction engineering and management 125 (4), 265-276, 1999
3141999
Average-bid method—competitive bidding strategy
PG Ioannou, SS Leu
Journal of construction engineering and management 119 (1), 131-147, 1993
1901993
General purpose simulation with stroboscope
JC Martinez, PG Ioannou
Proceedings of Winter Simulation Conference, 1159-1166, 1994
1801994
Company and project evaluation model for privately promoted infrastructure projects
A Dias Jr, PG Ioannou
Journal of Construction Engineering and Management 122 (1), 71-82, 1996
1521996
Debt capacity and optimal capital structure for privately financed infrastructure projects
A Dias Jr, PG Ioannou
Journal of Construction Engineering and Management 121 (4), 404-414, 1995
1281995
Graphical object-oriented discrete-event simulation system
LY Liu, PG Ioannou
Proceedings of the 24th conference on Winter simulation, 1285-1291, 1992
1051992
Comparison of construction alternatives using matched simulation experiments
PG Ioannou, JC Martinez
Journal of construction engineering and management 122 (3), 231-241, 1996
941996
Below-average bidding method
PG Ioannou, RE Awwad
Journal of Construction Engineering and Management 136 (9), 936-946, 2010
802010
UM-CYCLONE user’s guide
PG Ioannou
Dept. of Civil Engineering, The University of Michigan, Ann Arbor, Mich, 1989
761989
Geologic prediction model for tunneling
PG Ioannou
Journal of Construction Engineering and management 113 (4), 569-590, 1987
611987
Advanced construction technology system—ACTS
PG Ioannou, LY Liu
Journal of Construction Engineering and Management 119 (2), 288-306, 1993
581993
Repetitive scheduling method: Requirements, modeling, and implementation
PG Ioannou, IT Yang
Journal of Construction Engineering and Management 142 (5), 04016002, 2016
552016
State-based probabilistic scheduling using STROBOSCOPE’s CPM add-on
JC Martinez, PG Ioannou
Proc., Construction Congress V, 438-445, 1997
541997
Bidding models—Symmetry and state of information
PG Ioannou
Journal of Construction Engineering and Management 114 (2), 214-232, 1988
531988
Resource-driven scheduling for repetitive projects: A pull-system approach
IT Yang, PG Ioannou
Proceedings of the 9th International Group for Lean Construction Conference …, 2001
522001
Scheduling system with focus on practical concerns in repetitive projects
IT Yang, PG Ioannou
Construction Management and Economics 22 (6), 619-630, 2004
492004
Advantages of the activity scanning approach in the modeling of complex construction processes
JC Martinez, PG Ioannou
Proceedings of the 27th conference on Winter simulation, 1024-1031, 1995
461995
State and resource based construction process simulation
J Martinez, PG Ioannou, RI Carr
Computing in civil engineering, 177-184, 1994
451994
Resource leveling based on the modified minimum moment heuristic
J Martinez, P Ioannou
Computing in civil and building engineering, 287-294, 1993
441993
The system can't perform the operation now. Try again later.
Articles 1–20