Follow
andi rahadiyan wijaya
andi rahadiyan wijaya
Verified email at ugm.ac.id
Title
Cited by
Cited by
Year
Effectivity of activated biochar from waste of rubber seed shells and epicarp (Hevea brasiliensis) as a amelioration material towards pesticide residues in the soil
S Hutapea, EL Panggabean, TH Siregar, A Wijaya
CRRI and IRRDB International rubber conference, Siem Reap, Cambodia, 347-356, 2016
452016
Karakteristik Biochar Teraktivasi dari Limbah Cangkang dan Kendaga Biji Karet
S Hutapea, EL Panggabean, A Wijaya
PROSIDING SEMINAR NASIONAL, 2015
452015
Downtime analysis of drilling machines and suggestions for improvements
HS Al-Chalabi, J Lundberg, A Wijaya, B Ghodrati
Journal of Quality in Maintenance Engineering 20 (4), 306-332, 2014
412014
Implementing lean principle into mining industry issues and challenges
RW Andi, R Kumar, U Kumar
International Symposium on Mine Planning and Equipment Selection nov 16, 2009
392009
Utilization of rubber seed shells and epicarp wastes as activated biochar
S Hutapea, EL Panggabean, A Wijaya
Chemistry and Material Research 7 (12), 9-14, 2015
362015
Clarifying megaproject complexity in developing countries: A literature review and conceptual study
RW Damayanti, B Hartono, AR Wijaya
International Journal of Engineering Business Management 13, 18479790211027414, 2021
282021
Downtime analysis of a scaling machine
AR Wijaya, J Lundberg, U Kumar
International Journal of Mining, Reclamation and Environment 26 (3), 244-260, 2012
252012
Robust‐optimum multi‐attribute age‐based replacement policy
A Rahadiyan Wijaya, J Lundberg, U Kumar
Journal of Quality in Maintenance Engineering 18 (3), 325-343, 2012
212012
The effect of seat design on vibration comfort
AR Wijaya, P Jönsson, Ö Johansson
International journal of occupational safety and ergonomics 9 (2), 193-210, 2003
212003
Pengembangan Kuesioner Untuk Mengevaluasi Usabilitas E-Learning
A Kiswandari, R Dharmastiti, AR Wijaya
Jurnal Ergonomi Indonesia 2 (1), 318024, 2016
182016
Rancang bangun piranti termoakustik sebagai pemompa kalor
I Setiawan, ABS Utomo, G Maruto, AR Wijaya
Sigma 10 (1), 25-33, 2007
152007
Leadership competency for megaproject‘s complexity management: a conceptual study
RW Damayanti, B Hartono, AR Wijaya
International Journal of Innovation, Management and Technology 12 (4), 68-74, 2021
142021
A meta analysis study leadership and project success
RW Damayanti, B Hartono, AR Wijaya, AF Helmi, B Riyono
2018 International Conference on Industrial Enterprise and System …, 2019
132019
Evaluation of abrasive wear measurement devices of mill liners
R Dandotiya, J Lundberg, A Wijaya
International Journal of COMADEM 14 (2), 3-17, 2011
122011
Project managers’ perspectives on the complexity of construction megaproject in Indonesia: A multicase study
RW Damayanti, B Hartono, AR Wijaya
IEEE Engineering Management Review 49 (2), 153-171, 2021
112021
Complexity, leadership, and megaproject performance: A configuration analysis
R Damayanti, B Hartono, A Wijaya
Journal of Industrial Engineering and Management 14 (3), 570-603, 2021
102021
Combined factors effect of menstrual cycle and background noise on visual inspection task performance: A simulation-based task
T Wijayanto, Y Tochihara, AR Wijaya, S Hermawati
Journal of physiological anthropology 28 (6), 253-259, 2009
102009
Subayo. 2013
H Lestari, AR Wijaya
Pengukuran budaya organisasi pada industri minuman di jawa tengah untuk …, 0
9*
Penentuan safety stock, reorder point dan order quantity suku cadang mesin produksi berdasarkan ketidakpastian demand dan lead time pada perusahaan manufaktur (studi kasus di …
SW Nugraha
Universitas Gadjah Mada, 2015
72015
Pemanfaatan bot telegram sebagai media informasi di excellent private school paiton
R Hidayatullah, A Wijaya, FN Fajri
Univ. Nurul Jadid, 6, 2014
72014
The system can't perform the operation now. Try again later.
Articles 1–20