Follow
Frandhoni Utomo
Frandhoni Utomo
Verified email at student.uns.ac.id
Title
Cited by
Cited by
Year
Energy and exergy analysis of dry-steam geothermal power plant: Case study in kamojang geothermal power plant unit 2
ND Setyawan, NA Pambudi, F Utomo, H Saputro, R Adiprana, LH Saw, ...
MATEC Web of Conferences 197, 08018, 2018
42018
Performance improvement of drysteam geothermal power plant by employing bottoming binary system
ND Setyawan, NA Pambudi, F Utomo, LH Saw, M Gürtürk, SM Bina
IOP Conference Series: Earth and Environmental Science 249 (1), 012022, 2019
2019
Parabolic trough collector’s heat transfer analysis with changes of variation on the pipe absorber system
S Pranoto, NA Pambudi, NS Wardani, A Setyaji, A Susanto, ND Setyawan, ...
Journal of Physics: Conference Series 1153 (1), 012139, 2019
2019
ENERGY AND EXERGY ANALYSIS OF DRY-STEAM GEOTHERMAL POWER PLANT IN KAMOJANG
F Utomo, NA Pambudi, ND Setywan, W Sumbodo
International Journal of Power and Energy Systems 38 (1), 2018
2018
Analisis eksergi pembangkit listrik tenaga panas bumi kamojang unit 1-2-3 dengan penambahan unit baru optimasi uap terbuang dari Vent Structure menggunakan metode termodinamika
F Utomo
UNS (Sebelas Maret University), 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–5