Dwi Irwanto
Dwi Irwanto
Insititut Teknologi Bandung
Email yang diverifikasi di fi.itb.ac.id - Beranda
Judul
Dikutip oleh
Dikutip oleh
Tahun
Comparison of Monte Carlo calculation methods for effective delayed neutron fraction
Y Nagaya, G Chiba, T Mori, D Irwanto, K Nakajima
Annals of Nuclear Energy 37 (10), 1308-1315, 2010
332010
Preliminary neutronic design of high burnup OTTO cycle pebble bed reactor
T Setiadipura, D Irwanto, Z Zuhair
Atom Indonesia 41 (1), 7-15, 2015
292015
Burnup characteristics of a peu Ó peu fuel loading scheme in a 110MWt simplified pebble bed reactor
D Irwanto, T Obara
Journal of nuclear science and technology 48 (11), 1385-1395, 2011
182011
Burnup characteristics and fuel cycle economics of mixed uranium–thorium fuel in a simplified small pebble bed reactor
D Irwanto, T Obara
Journal of nuclear science and technology 49 (2), 222-229, 2012
122012
Design Study of 200MWth Gas Cooled Fast Reactor with Nitride (UN-PuN) Fuel Long Life without Refueling
RD Syarifah, Y Yulianto, Z Su’ud, K Basar, D Irwanto
MATEC Web of Conferences 82, 03008, 2016
112016
Decay heat removal without forced cooling on a small simplified PBR with an accumulative fuel loading scheme
D Irwanto, T Obara
Annals of Nuclear Energy 60, 383-395, 2013
112013
Neutronic analysis of thorium nitride (Th, U233) N fuel for 500MWth gas cooled fast reactor (GFR) long life without refueling
RD Syarifah, Y Yulianto, Z Su’ud, K Basar, D Irwanto
Key Engineering Materials 733, 47-50, 2017
102017
The prospect of uranium nitride (UN-PuN) fuel for 25-100MWe gas cooled fast reactor long life without refuelling
RD Syarifah, Z Su'ud, K Basar, D Irwanto
Journal of Physics: Conference Series 776 (1), 012103, 2016
102016
Preliminary neutronic study on Pu-based OTTO cycle pebble bed reactor
T Setiadipura, D Irwanto
Kerntechnik 82 (6), 643-647, 2017
82017
Fuel Fraction Analysis of 500 MWth Gas Cooled Fast Reactor with Nitride (UN-PuN) Fuel without Refueling
RD Syarifah, Z Su’ud, K Basar, D Irwanto
Journal of Physics: Conference Series 799 (1), 012022, 2017
82017
Study on calculation methods for the effective delayed neutron fraction
D Irwanto, T Obara, G Chiba, Y Nagaya
72011
Comparison of uranium plutonium nitride (U‐Pu‐N) and thorium nitride (Th‐N) fuel for 500 MWth gas‐cooled fast reactor (GFR) long life without refueling
RD Syarifah, Z Su'ud, K Basar, D Irwanto, SC Pattipawaej, M Ilham
International Journal of Energy Research 42 (1), 214-220, 2018
62018
Comparative Study on Various Geometrical Core Design of 300 MWth Gas Cooled Fast Reactor with UN-PuN Fuel Longlife without Refuelling
RD Syarifah, Z Su’ud, K Basar, D Irwanto
Journal of Physics: Conference Series 877 (1), 012064, 2017
52017
Major outcomes from OECD/NEA ROSA and ROSA-2 Projects
H Nakamura, T Takeda, A Satou, M Ishigaki, S Abe, D Irwanto
Proceedings of the 15th International Topical Meeting on Nuclear Reactorá…, 2013
52013
Burnup Characteristics of Peu-Ó-Peu Fuel Loading Scheme in Small PBR
D Irwanto, T Obara, Y Kato, I Yamanaka
Transactions 103 (1), 791-792, 2010
52010
Preliminary Design Study of Small Power 30-50 MWt Experiment Power Reactor based on High Temperature Pebble Bed Gas Cooled Reactor Technology
D Irwanto, S Permana, A Pramutadi, S Pramuditya
Journal of Physics: Conference Series 1127 (1), 012024, 2019
42019
Neutronic Analysis of UN-PuN Fuel use FI-ITB-CHI Code for 500MWth GFR Long Life Without Refueling
RD Syarifah, Z Su’ud, K Basar, D Irwanto
Journal of Physics: Conference Series 1090 (1), 012033, 2018
42018
Neutronic Comparison Study Between Pb (208)-Bi and Pb (208) as a Coolant In The Fast Reactor With Modified CANDLE Burn up Scheme.
N Widiawati, Z Suud, D Irwanto, H Sekimoto
Journal of Physics: Conference Series 1090 (1), 012071, 2018
42018
Prediction of Melting Penetration of Armco Iron by Liquid Uranium Using MPS_LER
APA Mustari, D Irwanto, NA Aprianti
Journal of Physics: Conference Series 799 (1), 012019, 2017
42017
Comparative Evaluation on Several Reactor Type of Actinide Closed-Cycle Schemes
S Permana, A Pramutadi, S Pramuditya, D Irwanto
Journal of Physics: Conference Series 1090 (1), 012011, 2018
32018
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20