Akhmad Sutoni
Akhmad Sutoni
Lecturer of Industrial Engineering, Suryakancana University
Email yang diverifikasi di ft.unsur.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Penjadwalan Pengiriman Produk Kaos Oleh CV Chronicle Mart Kepada Sub Distributor Cianjur Dengan Mengunakan Metoda DRP (Distribution Requirement Planning)
A Sutoni, D Agustian
Jurnal Manajeman Industri dan Logistik 1 (2), 2017
6*2017
Determination of regional main products with fuzzy logic approach in regional Sula Island of North Maluku Province
A Sutoni
2018 International Conference on Digital Arts, Media and Technology (ICDAMT …, 2018
42018
Perencanaan dan Penentuan Jadwal Induk Produksi di PT Arwina Triguna Sejahtera
MN Sidiq, A Sutoni
Jurnal Media Teknik dan Sistem Industri (JMTSI) 1, 2017
42017
ANALISIS PERSEDIAAN MENGGUNAKAN METODE PERIODIC ORDER QUANTITY (POQ)(STUDI KASUS: DI BB BAROKAH CIANJUR)
A Sutoni
IKRA-ITH Teknologi: Jurnal Sains & Teknologi 2 (3), 55-61, 2018
32018
Perencanaan Persediaan Bahan Baku Berdasarkan Permintaan Probabilistik
A Sutoni, ED Juandi
Journal Industrial Servicess 3 (1a), 2017
32017
Uji Kuat Tekan dan Daya Serap pada Batako dengan Menggunakan Metode Taguchi
A Sutoni
Jurnal Sistem Dan Manajemen Industri 2 (2), 93-100, 2018
22018
Konsep Pengembangan Inovasi Keripik Gadung, Dalam Pemberdayaan Masyarakat Di Desa Kutawaringin, Kecamatan Mande, Kabupaten Cianjur
A Sutoni, I Masrofah
Ikra-Ith Abdimas 1 (2), 71-79, 2018
22018
Analisis Daya Serap dan Daya Tekan Batako Pres, Terhadap Interaksi Faktor Pekerja, Faktor Komposisi Air, dan Faktor Komposisi Kapur-Pasir
A Sutoni, D Gunawan
Jurnal Media Teknik dan Sistem Industri 2 (1), 39-44, 2018
22018
ANALISIS KEPUASAN PELANGGAN TERHADAP KUALITAS PELAYANAN MENGGUNAKAN METODE SERVICE QUALITY DAN IMPORTANCE PERFORMANCE ANALYSIS
W Setyawan, A Sutoni, NZ Erfasa
Journal Industrial Servicess 3 (1a), 2017
22017
ANALISIS PERSEDIAAN SUKU CADANG KENDARAAN RODA DUA DENGAN MENGGUNAKAN METODA ALGORITMA WAGNER WITHIN (Sudi Kasus pada BB. Barokah Cianjur)
A Sutoni, D Setiawan
Seminar Nasional ke-2 Sains, Rekayasa & Teknologi SNSRT 2017 Universitas …, 2017
22017
Total Productive Maintenance (TPM) Analysis on Lathe Machines using the Overall Equipment Effectiveness Method and Six Big Losses
A Sutoni, W Setyawan, T Munandar
Journal of Physics: Conference Series 1179 (1), 012089, 2019
12019
Penerapan Metode Taguchi Dalam Interaksi Komposisi Batako Pres Terhadap Kualitas Daya Serap Dan Daya Tekan Batako
A Sutoni, W Setyawan, D Gunawan
Jurnal Telematika, 15-20, 2018
12018
Penentuan Jarak Pendistribusian Gas LPG 3 Kg Dengan Metode Algoritma Heuristik
A Sutoni, N Asilah
Jurnal Media Teknik dan Sistem Industri 2 (2), 37-42, 2018
12018
Perencanaan Persediaan dengan Metode Q untuk Permintaan Probabilistik pada Bibit Bunga Krisan di PT. Transplants Indonesia
DH Taufik, A Sutoni
IENACO (Industrial Engineering National Conference) 6 2018, 2018
12018
Analysis of Coconut Supply Chain as Industry Potential in Sula Islands Regency, North Maluku Province
A Sutoni
Jurnal Media Teknik dan Sistem Industri 4 (1), 18-24, 2020
2020
ANALISIS RISIKO DALAM CONSTRUCTION SUPPLY CHAIN: Studi Kasus Pada Proyek Renovasi Gedung Kantor Vedca
A Sutoni, DR Kurniadi
Jurnal Media Teknik dan Sistem Industri 3 (2), 81-89, 2020
2020
Analysis of replacement and selection of machines using dynamic program and AHP methods
A Sutoni, A Gopar
IOP Conference Series: Materials Science and Engineering 673 (1), 012085, 2019
2019
Analisis Kepuasan Konsumen dan Pengembangan Produk Menggunakan Metode Kano dan House Of Quality
A Sutoni, P Ramadian
Seminar dan Konferensi Nasional IDEC 2019 UNS 7, D02.1 - D02.10, 2019
2019
Analisis Persediaan dalam Proyek Renovasi Gedung Menggunakan Metode Material Requirements Planning dengan Teknik Lot For Lot
SA Azis, A Sutoni
Seminar dan Konferensi Nasional IDEC 2019 UNS 7, A03.1 - A03.8, 2019
2019
Inventory Planning with Method Q and Method P for Probabilistic Demand on Chrysanthemum Seeds at PT Transplants Indonesia
A Sutoni, DH Taufik
International Journal of Innovation in Enterprise System 3 (01), 38-46, 2019
2019
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20