Ikuti
mohammad arif rohman
mohammad arif rohman
Department of Civil Engineering, Institut Teknologi Sepuluh Nopember (ITS)
Email yang diverifikasi di ce.its.ac.id - Beranda
Judul
Dikutip oleh
Dikutip oleh
Tahun
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
A Idrus, MF Nuruddin, MA Rohman
Expert Systems with Applications 38 (3), 1501-1508, 2011
1322011
Success criteria of toll road projects from a community societal perspective
MA Rohman, H Doloi, CA Heywood
Built environment project and asset management, ISSN: 2044-124X ., DOI 10 …, 2017
332017
Analisa Penyebab Keterlambatan Proyek Pembangunan Sidoarjo Town Square Menggunakan Metode Fault Tree Analysis (FTA)
R Amalia, MA Rohman, CB Nurcahyo
Jurnal Teknik ITS 1 (1), D20-D23, 2012
212012
Penilaian Kriteria Green Building pada Gedung Teknik Sipil ITS
AA Putri, MA Rohman, C Utomo
Jurnal Teknik ITS 1 (1), D107-D112, 2012
192012
Evaluation of road design performance in delivering community project social benefits in Indonesian PPP
MA Rohman, IPA Wiguna
International Journal of Construction Management, 1-13, 2019
172019
Analysis The Effect of Total Quality Management, Technology, and Knowledge Management on Product Quality in Indonesia Construction Industry
MY Latansa, TJW Adi, MA Rohman
IPTEK Journal of Proceedings Series, 527-535, 2019
52019
The barrier and driver factors of building information modelling (BIM) adoption in indonesia: a preliminary survey
FR Utomo, MA Rohman
IPTEK Journal of Proceedings Series, 133-139, 2019
52019
Rencana Kontijensi untuk Tanah Longsor di Desa Kalikuning, Pacitan, Jawa Timur
T Tatas, IPA Wiguna, M Machsus, TD Widyastuti, MA Rohman
Jurnal Aplikasi Teknik Sipil 13 (2), 27-40, 2015
52015
Analisis Risiko Pada Proyek Flyover Pasar Kembang Surabaya
BB Baskoro, CN Bintang, MA Rohman
Retrieved June 5, 2020, 2012
52012
Risk analysis of traffic congestion due to problem in heavy vehicles: a concept
PA Kesuma, MA Rohman, CA Prastantyo
First International Conference of Construction, Infrastructure, and …, 2019
42019
Analisis Prioritas Pemeliharaan Jalan Kabupaten Karanganyar Metode Analytical Hierarchy Process (AHP)
V Sushera
Institut Teknologi Sepuluh Nopember, 2018
42018
Understanding Social sustainability criteria for public school building
MA Rohman, YA Hidayat
IOP conference series: materials science and engineering 636 (1), 012022, 2019
32019
A framework for green supply chain management in construction sector: A case study in Indonesia
IPA Wiguna, F Rachmawati, MA Rohman, LB Setyaning
Journal of Industrial Engineering and Management 14 (4), 788-807, 2021
22021
Analysing the root cause of the damage risk in heavy vehicles to reduce traffic congestion
PA Kesuma, MA Rohman, CA Prastyanto
International Journal of Construction Management, 1-12, 2020
22020
Analisa Perbandingan Metode Pelaksanaan Cast in Situ Dengan Pracetak Terhadap Biaya dan Waktu Pada Proyek Dian Regency Apartemen
F Fani, IPA Wiguna, MA Rohman
Surabaya: Jurnal Teknik POMITS 1 (1), 1-6, 2012
22012
Importance and Performance Ratings Analysis for Implementation of Green Construction on Building Project
FR Prameswari, F Rachamawati, IPA Wiguna, MA Rohman
IOP Conference Series: Earth and Environmental Science 799 (1), 012015, 2021
12021
Identification of fire safety indicators for shopping centre buildings in Surabaya
GF Marantika, MA Rohman, F Rachmawati, IPA Wiguna
IOP Conference Series: Materials Science and Engineering 930 (1), 012009, 2020
12020
Pelatihan Manajemen Keuangan UMKM Konstruksi di Surabaya untuk Keberlanjutan Kinerja Usaha
YE Putri, C Utomo, R Indryani, C Rahmawati, MA Rohman
Seminar Nasional Penelitian Dan Pengabdian Kepada Masyarakat 2, 383-392, 2020
12020
Social sustainability indicators for school buildings in Surabaya
YA Hidayat, MA Rohman, C Utomo
International Conference on Planning towards Sustainability (ICoPS), 1-8, 2020
12020
The Influence of Communication on the Success Design of High-Rise Residential Building on Surabaya
D Listyaningsih, C Utomo, MA Rohman
AWAM International Conference on Civil Engineering, 1537-1547, 2019
12019
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20