Follow
Fachrurrazi
Fachrurrazi
Verified email at unsyiah.ac.id - Homepage
Title
Cited by
Cited by
Year
Implementasi Pendukung Keputusan Dalam Pemilihan Calon Peserta Cerdas Cermat Tingkat SMA Menerapkan Metode VIKOR
N Sutrikanti, H Situmorang, F Fachrurrazi, H Nurdiyanto, M Mesran
Jurikom (jurnal riset komputer) 5 (2), 109-113, 2018
842018
Implementing fuzzy TOPSIS on project risk variable ranking
S Husin, F Fachrurrazi, M Rizalihadi, M Mubarak
Advances in Civil Engineering 2019 (1), 9283409, 2019
292019
Neural Network for the Standard Unit Price of The Building Area
Fachrurrazi, S Husin, Tripoli, Mubarak
Procedia Engineering 117, 282-293, 2017
19*2017
The Subcontractor Selection Practice Using Ann-Multilayer
Fachrurrazi, S Husin, Munirwansyah, Husaini
International Journal of Technology 8 (4), 761-772, 2017
172017
Predicting red clay swelling behaviour of Jangka Buya–Pidie Jaya earthquake zone in Aceh
M Munirwansyah, RP Munirwan, M Sungkar, F Fachrurrazi
AIP Conference Proceedings 2059 (1), 2019
92019
The Weights Detection of Multi-criteria by Using Solver
F Fachrurrazi, Y Away, S Husin
International Journal of Electrical and Computer Engineering 7 (2), 858-868, 2017
82017
Aplikasi software winest terhadap perhitungan rencana anggaran biaya (studi kasus pembuatan jaringan irigasi Meudang Ara Kecamatan Syamtalira Bayu Kabupaten Aceh Utara)
F Fachrurrazi, M Mubarak, S Fachreza
Jurnal Teknik Sipil 4 (3), 323-332, 2015
52015
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality
S Husin, M Mubarak, F Fachrurrazi
Aceh International Journal of Science and Technology 8 (2), 106-113, 2019
42019
The End User Requirement for Project Management Software Accuracy
F Fachrurrazi
International Journal of Electrical and Computer Engineering 8 (2), 1112-1121, 2018
42018
Project Risk Patterns: A Comparison Across Three Periods
Fachrurrazi, S Husin, Mahmuddin
International Journal on Advanced Science, Engineering and Information …, 2018
42018
Negative Total Float to Improve a Multi-objective Integer Non-linear Programming for Project Scheduling Compression
Fachrurrazi, Abdullah, Y Away, TB Aulia
International Journal of Electrical and Computer Engineering 8 (6), 5292-5302, 2018
32018
TIME-COST TRADE-OFF MODEL FOR TIE BEAM ACTIVITY
F Fachrurrazi, M Mahmuddin, CY Anas
Jurnal Teknik Sipil 7 (1), 9-15, 2018
32018
Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
F Fachrurrazi, A Abdullah, Y Away, TB Aulia
MATEC Web of Conferences 197, 10004, 2018
32018
Strategi Pengembangan Sarana dan Prasarana Ekowisata Krueng Jalin Kota Jantho
F Fachrurrazi, SM Saleh, I Izziah
Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (2), 119-128, 2022
12022
Aplikasi Artificial Neural Network (ANN) pada Model Prediksi Kuat Tarik Belah Beton Busa
NH Bakhtiar, M Afifuddin, F Fachrurrazi
Journal of The Civil Engineering Student 4 (1), 29-35, 2022
12022
Prediksi Kuat Tekan Beton Kinerja Tinggi Dengan Pemodelan Metode Artificial Neural Network (ANN)
M Afifuddin, D Nafira, F Fachrurrazi
Jurnal Teknik Sipil 10 (2), 106-113, 2021
12021
Model Time-Cost Trade Off untuk Pekerjaan Kolom Utama di Kabupaten Aceh Selatan
I Isra, S Husin, F Fachrurrazi
Journal of The Civil Engineering Student 1 (3), 98-104, 2019
12019
Identifying inaccuracy of MS Project using system analysis
Fachrurrazi, Saiful, Malahayati, Irzaidi
IOP Conference Series: Materials Science and Engineering 352 (1), 012036, 2018
12018
The impact of internal risk factors on cost of drainage projects in Aceh Province
ST Agus, M Mubarak, F Fachrurrazi, M Rizalihadi, Z Ziana
AIP Conference Proceedings 3082 (1), 2024
2024
Tingkat Kepuasan Pemilik Rumah Bantuan Pasca Bencana Gempa di Kabupaten Pidie Jaya dengan Rekonstruksi Berbasis Kontraktor
A Nabilah, N Malahayati, F Fachrurrazi
Journal of The Civil Engineering Student 5 (3), 302-308, 2023
2023
The system can't perform the operation now. Try again later.
Articles 1–20