Implementasi Pendukung Keputusan Dalam Pemilihan Calon Peserta Cerdas Cermat Tingkat SMA Menerapkan Metode VIKOR N Sutrikanti, H Situmorang, F Fachrurrazi, H Nurdiyanto, M Mesran Jurikom (jurnal riset komputer) 5 (2), 109-113, 2018 | 84 | 2018 |
Implementing fuzzy TOPSIS on project risk variable ranking S Husin, F Fachrurrazi, M Rizalihadi, M Mubarak Advances in Civil Engineering 2019, 2019 | 28 | 2019 |
The Subcontractor Selection Practice Using Ann-Multilayer Fachrurrazi, S Husin, Munirwansyah, Husaini International Journal of Technology 8 (4), 761-772, 2017 | 17 | 2017 |
Neural Network for the Standard Unit Price of The Building Area Fachrurrazi, S Husin, Tripoli, Mubarak Procedia Engineering 117, 282-293, 2017 | 13* | 2017 |
Predicting red clay swelling behaviour of Jangka Buya–Pidie Jaya earthquake zone in Aceh M Munirwansyah, RP Munirwan, M Sungkar, F Fachrurrazi AIP Conference Proceedings 2059 (1), 2019 | 9 | 2019 |
The Weights Detection of Multi-criteria by Using Solver F Fachrurrazi, Y Away, S Husin International Journal of Electrical and Computer Engineering 7 (2), 858-868, 2017 | 8 | 2017 |
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality S Husin, M Mubarak, F Fachrurrazi Aceh International Journal of Science and Technology 8 (2), 106-113, 2019 | 4 | 2019 |
The End User Requirement for Project Management Software Accuracy F Fachrurrazi International Journal of Electrical and Computer Engineering 8 (2), 1112-1121, 2018 | 4 | 2018 |
Project Risk Patterns: A Comparison Across Three Periods Fachrurrazi, S Husin, Mahmuddin International Journal on Advanced Science, Engineering and Information …, 2018 | 4 | 2018 |
Aplikasi software winest terhadap perhitungan rencana anggaran biaya (studi kasus pembuatan jaringan irigasi Meudang Ara Kecamatan Syamtalira Bayu Kabupaten Aceh Utara) F Fachrurrazi, M Mubarak, S Fachreza Jurnal Teknik Sipil 4 (3), 323-332, 2015 | 4 | 2015 |
Negative Total Float to Improve a Multi-objective Integer Non-linear Programming for Project Scheduling Compression Fachrurrazi, Abdullah, Y Away, TB Aulia International Journal of Electrical and Computer Engineering 8 (6), 5292-5302, 2018 | 3 | 2018 |
TIME-COST TRADE-OFF MODEL FOR TIE BEAM ACTIVITY F Fachrurrazi, M Mahmuddin, CY Anas Jurnal Teknik Sipil 7 (1), 9-15, 2018 | 3 | 2018 |
Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity F Fachrurrazi, A Abdullah, Y Away, TB Aulia MATEC Web of Conferences 197, 10004, 2018 | 3 | 2018 |
Aplikasi Artificial Neural Network (ANN) pada Model Prediksi Kuat Tarik Belah Beton Busa NH Bakhtiar, M Afifuddin, F Fachrurrazi Journal of The Civil Engineering Student 4 (1), 29-35, 2022 | 1 | 2022 |
Prediksi Kuat Tekan Beton Kinerja Tinggi Dengan Pemodelan Metode Artificial Neural Network (ANN) M Afifuddin, D Nafira, F Fachrurrazi Jurnal Teknik Sipil 10 (2), 106-113, 2021 | 1 | 2021 |
Model Time-Cost Trade Off untuk Pekerjaan Kolom Utama di Kabupaten Aceh Selatan I Isra, S Husin, F Fachrurrazi Journal of The Civil Engineering Student 1 (3), 98-104, 2019 | 1 | 2019 |
Identifying inaccuracy of MS Project using system analysis Fachrurrazi, Saiful, Malahayati, Irzaidi IOP Conference Series: Materials Science and Engineering 352 (1), 012036, 2018 | 1 | 2018 |
The impact of internal risk factors on cost of drainage projects in Aceh Province ST Agus, M Mubarak, F Fachrurrazi, M Rizalihadi, Z Ziana AIP Conference Proceedings 3082 (1), 2024 | | 2024 |
Tingkat Kepuasan Pemilik Rumah Bantuan Pasca Bencana Gempa di Kabupaten Pidie Jaya dengan Rekonstruksi Berbasis Kontraktor A Nabilah, N Malahayati, F Fachrurrazi Journal of The Civil Engineering Student 5 (3), 302-308, 2023 | | 2023 |
Structural evaluation on HSD oil storage tanks by hydrostatic method P Hasibuan, S Rizal, M Hasan, T Saidi, Z Auliy, F Fachrurrazi, A Panjaitan, ... AIP Conference Proceedings 2711 (1), 2023 | | 2023 |