Follow
SINERGI
Title
Cited by
Cited by
Year
ANALISIS OPTIMASI KINERJA QUALITY OF SERVICE PADA LAYANAN KOMUNIKASI DATA MENGGUNAKAN NS-2 DI PT. PLN (PERSERO) JEMBER
YA Pranata, I Fibriani, SB Utomo
SINERGI 20 (2), 149-156, 2016
702016
THE EVALUATION OF EIGHT PILLARS TOTAL PRODUCTIVE MAINTENANCE (TPM) IMPLEMENTATION AND THEIR IMPACT ON OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND WASTE
HA Prabowo, YB Suprapto, F Farida
SINERGI 22 (1), 13-18, 2018
572018
ANALISIS PENGUKURAN KINERJA PERUSAHAAN DENGAN METODE PERFORMANCE PRISM DAN SCORING OBJECTIVE MATRIX (OMAX) PADA PT. BPAS
Adianto, MA Saryatmo, AS Gunawan
SINERGI 18 (2), 61-70, 2014
372014
ANALISIS KEGAGALAN PROSES INSULASI PADA PRODUKSI AUTOMOTIVE WIRES (AW) DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) PADA PT JLC
H Hasbullah, M Kholil, DA Santoso
SINERGI 21 (3), 193-203, 2017
332017
Kuat tekan beton mutu tinggi menggunakan bahan tambah abut terbang (fly ash) dan zat adiktif (bestmittel)
M Ervianto, F Saleh, H Prayuda
Sinergi 20 (3), 199-206, 2016
312016
PENGARUH ORIENTASI OBJEK PADA PROSES 3D PRINTING BAHAN POLYMER PLA DAN ABS TERHADAP KEKUATAN TARIK DAN KETELITIAN DIMENSI PRODUK
S Lubis, S Djamil, Yolanda
SINERGI 20 (1), 27-35, 2016
302016
IMPLEMENTASI SINGLE MINUTE EXCHANGE OF DIES (SMED) UNTUK OPTIMASI WAKTU CHANGEOVER MODEL PADA PRODUKSI PANEL TELEKOMUNIKASI
A Mulyana, S Hasibuan
SINERGI 21 (2), 107-114, 2017
282017
Decision Support System For Smartphone Recommendation: The Comparison Of Fuzzy AHP and Fuzzy ANP In Multi-Attribute Decision Making.
O Okfalisa, H Rusnedy, DU Iswavigra, B Pranggono, E Haerani, ...
SINERGI 25 (1), 101-110, 2021
272021
RANCANGBANGUN DAN ANALISA CCTV ONLINE BERBASIS RASPBERRY PI
A Adriansyah, MR GM, Yuliza
SINERGI 18 (2), 105-110, 2014
272014
ANALISIS TOTAL PRODUCTIVE MAINTENANCE DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN FUZZY FAILURE MODE AND EFFECTS ANALYSIS
S Supriyadi, G Ramayanti, R Afriansyah
SINERGI 21 (3), 165-172, 2017
262017
TINJAUAN KUALITAS PADA AEROSOL CAN Ø 65 X 124 DENGAN PENDEKATAN METODE SIX SIGMA PADA LINE ABM 3 DEPARTEMEN ASSEMBLY
M Kholil, ED Prasetyo
SINERGI 21 (1), 53-58, 2017
252017
PERANCANGAN BEJANA TEKAN (PRESSURE VESSEL) UNTUK SEPARASI 3 FASA
A Aziz, A Hamid, I Hidayat
SINERGI 18 (1), 31-38, 2014
252014
HUMAN FOLLOWING ON ROS FRAMEWORK A MOBILE ROBOT
G Priyandoko, CK Wei, MSH Achmad
SINERGI 22 (2), 77-82, 2018
232018
IMPLEMENTATION OF FREQUENCY RESPONSE FUNCTION ON TAPPER BEARING MAINTENANCE
A Susanto, SQ Yusuf, A Hamid, H Wahyudi, S Subekti
SINERGI 23 (2), 132-138, 2019
222019
DESIGN WORK STATION OF PIPE WELDING WITH ERGONOMIC APPROACH
S Ariyanti, L Widodo, M Zulkarnain, K Timotius
SINERGI 23 (2), 107-114, 2019
212019
BUILDING ENVELOPE COMPONENT TO CONTROL THERMAL INDOOR ENVIRONMENT IN SUSTAINABLE BUILDING: A REVIEW Abraham Seno Bachrun, Ting Zhen Ming, Anastasia Cinthya
AS Bachrun, TZ Ming, A Cinthya
SINERGI 23 (2), 79-98, 2019
212019
PENJADWALAN PRODUKSI IKS-FILLER PADA PROSES GROUND CALCIUM CARBONATE MENGGUNAKAN METODE MPS DI PERUSAHAAN KERTAS
Supriyadi, Riskiyadi
SINERGI 20 (2), 157-164, 2016
212016
REDUCING THE PRODUCT CHANGEOVER TIME USING SMED & 5S METHODS IN THE INJECTION MOLDING INDUSTRY
D Agung, H Hasbullah
SINERGI 23 (3), 199-212, 2019
202019
MONITORING OF ELECTRICAL SYSTEM USING INTERNET OF THINGS WITH SMART CURRENT ELECTRIC SENSORS
MHI Hajar, AW Dani, S Miharno
SINERGI 22 (3), 211-218, 2018
202018
PENGARUH PENAMBAHAN ZAT ADITIF OCTANE BOOSTER X TERHADAP KINERJA DAN EMISI GAS BUANG KENDARAAN SEPEDA MOTOR TIPE ALL NEW CBR150R
R Permatasari, GY Rahmadian
SINERGI 21 (3), 179-186, 2017
192017
The system can't perform the operation now. Try again later.
Articles 1–20