ANALISIS OPTIMASI KINERJA QUALITY OF SERVICE PADA LAYANAN KOMUNIKASI DATA MENGGUNAKAN NS-2 DI PT. PLN (PERSERO) JEMBER YA Pranata, I Fibriani, SB Utomo SINERGI 20 (2), 149-156, 2016 | 68 | 2016 |
THE EVALUATION OF EIGHT PILLARS TOTAL PRODUCTIVE MAINTENANCE (TPM) IMPLEMENTATION AND THEIR IMPACT ON OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND WASTE HA Prabowo, YB Suprapto, F Farida SINERGI 22 (1), 13-18, 2018 | 57 | 2018 |
ANALISIS KEGAGALAN PROSES INSULASI PADA PRODUKSI AUTOMOTIVE WIRES (AW) DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) PADA PT JLC H Hasbullah, M Kholil, DA Santoso SINERGI 21 (3), 193-203, 2017 | 30 | 2017 |
Kuat tekan beton mutu tinggi menggunakan bahan tambah abut terbang (fly ash) dan zat adiktif (bestmittel) M Ervianto, F Saleh, H Prayuda Sinergi 20 (3), 199-206, 2016 | 29 | 2016 |
PENGARUH ORIENTASI OBJEK PADA PROSES 3D PRINTING BAHAN POLYMER PLA DAN ABS TERHADAP KEKUATAN TARIK DAN KETELITIAN DIMENSI PRODUK S Lubis, S Djamil, Yolanda SINERGI 20 (1), 27-35, 2016 | 27 | 2016 |
ANALISIS TOTAL PRODUCTIVE MAINTENANCE DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN FUZZY FAILURE MODE AND EFFECTS ANALYSIS S Supriyadi, G Ramayanti, R Afriansyah SINERGI 21 (3), 165-172, 2017 | 25 | 2017 |
TINJAUAN KUALITAS PADA AEROSOL CAN Ø 65 X 124 DENGAN PENDEKATAN METODE SIX SIGMA PADA LINE ABM 3 DEPARTEMEN ASSEMBLY M Kholil, ED Prasetyo SINERGI 21 (1), 53-58, 2017 | 25 | 2017 |
ANALISIS PENGUKURAN KINERJA PERUSAHAAN DENGAN METODE PERFORMANCE PRISM DAN SCORING OBJECTIVE MATRIX (OMAX) PADA PT. BPAS Adianto, MA Saryatmo, AS Gunawan SINERGI 18 (2), 61-70, 2014 | 25 | 2014 |
IMPLEMENTASI SINGLE MINUTE EXCHANGE OF DIES (SMED) UNTUK OPTIMASI WAKTU CHANGEOVER MODEL PADA PRODUKSI PANEL TELEKOMUNIKASI A Mulyana, S Hasibuan SINERGI 21 (2), 107-114, 2017 | 24 | 2017 |
RANCANGBANGUN DAN ANALISA CCTV ONLINE BERBASIS RASPBERRY PI A Adriansyah, MR GM, Yuliza SINERGI 18 (2), 105-110, 2014 | 24 | 2014 |
Decision Support System For Smartphone Recommendation: The Comparison Of Fuzzy AHP and Fuzzy ANP In Multi-Attribute Decision Making. O Okfalisa, H Rusnedy, DU Iswavigra, B Pranggono, E Haerani, ... SINERGI 25 (1), 101-110, 2021 | 23 | 2021 |
PERANCANGAN BEJANA TEKAN (PRESSURE VESSEL) UNTUK SEPARASI 3 FASA A Aziz, A Hamid, I Hidayat SINERGI 18 (1), 31-38, 2014 | 22 | 2014 |
HUMAN FOLLOWING ON ROS FRAMEWORK A MOBILE ROBOT G Priyandoko, CK Wei, MSH Achmad SINERGI 22 (2), 77-82, 2018 | 21 | 2018 |
DESIGN WORK STATION OF PIPE WELDING WITH ERGONOMIC APPROACH S Ariyanti, L Widodo, M Zulkarnain, K Timotius SINERGI 23 (2), 107-114, 2019 | 19 | 2019 |
PENJADWALAN PRODUKSI IKS-FILLER PADA PROSES GROUND CALCIUM CARBONATE MENGGUNAKAN METODE MPS DI PERUSAHAAN KERTAS Supriyadi, Riskiyadi SINERGI 20 (2), 157-164, 2016 | 19 | 2016 |
ANALISA KEPUASAN PELANGGAN SEBAGAI UPAYA PENINGKATAN KUALITAS PELAYANAN DI SF DIGITAL PHOTO SERVICE H Kesumajayansyah, MAB Yuwono SINERGI 18 (1), 39-46, 2014 | 18 | 2014 |
MONITORING OF ELECTRICAL SYSTEM USING INTERNET OF THINGS WITH SMART CURRENT ELECTRIC SENSORS MHI Hajar, AW Dani, S Miharno SINERGI 22 (3), 211-218, 2018 | 17 | 2018 |
PERANCANGAN INSTALASI PENANGKAL PETIR EKSTERNAL METODA FRANKLIN PADA POLITEKNIK ENJINERING INDORAMA A Suryadi SINERGI 21 (3), 219-230, 2017 | 17 | 2017 |
PERANCANGAN SCORE BOARD DAN TIMER MENGGUNAKAN LED RGB BERBASIS ARDUINO DENGAN KENDALI SMART PHONE ANDROID F Supegina, Z Iklima SINERGI 19 (1), 13-18, 2015 | 17 | 2015 |
Setting Koordinasi Over Current Relay pada Trafo 60 MVA 150/20 Kv dan Penyulang 20 KV B Sulle, B Wirawan SINERGI 18 (3), 134-140, 2014 | 17* | 2014 |