Studi nilai produktivitas pekerjaan pondasi bored pile M Mubarak, AT Bulba, M Yunita Jurnal Teknik Sipil 3 (2), 199-208, 2014 | 13 | 2014 |
Procurement selection practices in post disaster project management: a case study in Banda Aceh, Indonesia AHA Bakar, O Osman, AT Bulba | 4 | 2009 |
Pengaruh Keterlambatan Proses Pengadaan Tanah terhadap Pencapaian Waktu Proyek MA Nugraha, CZ Oktaviani, AT Bulba Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (1), 59-68, 2022 | 1 | 2022 |
Prioritas Peningkatan Jalan di Kabupaten Pidie Jaya Berbasis Analytical Hierarchy Process (AHP) Y Mahendra, R Anggraini, AT Bulba Teras Jurnal: Jurnal Teknik Sipil 11 (1), 191-200, 2021 | 1 | 2021 |
Isue Aksesibilitas dan Pengembangan Wilayah sebagai Kriteria Penentu Prioritas Peningkatan Jalan di Kabupaten Pidie Jaya AI Antony, R Anggraini, AT Bulba Teras Jurnal: Jurnal Teknik Sipil 11 (1), 214-222, 2021 | 1 | 2021 |
The Relationship of Drivers to Implementation of Sustainable Procurement in Aceh R Maulana, CZ Oktaviani, AT Bulba Proceeding of the International Conference on Multidisciplinary Research for …, 2024 | | 2024 |
THE EFFECT OF PROJECT MANAGER COMPETENCE ON THE ACHIEVEMENT OF CONSTRUCTION PROJECT PERFORMANCE MF Surya, A Rauzana, AT Bulba Jurnal Impresi Indonesia 3 (2), 170-175, 2024 | | 2024 |
Analysis of the Level of Importance and Ease of Implementing Lean Construction in Building Construction Projects in Aceh Province, Indonesia R Syathabi, AT Bulba, A Rauzana Natural Sciences Engineering and Technology Journal 4 (1), 274-284, 2024 | | 2024 |
Identifying the Growth Centers in Banda Aceh City, Indonesia: Before and After Tsunami TD Dhaifullah, N Fadhly, AT Bulba International Journal of Global Optimization and Its Application 2 (4), 265-276, 2023 | | 2023 |
Effect of LSMC Implementation on Contractor Performance for National Road Construction In Aceh, Indonesia AT Bulba, A Rauzana Apollo: Journal of Tourism and Business 1 (3), 93-96, 2023 | | 2023 |
Persepsi Kontraktor Terhadap Faktor Penyebab Keterlambatan Pembayaran Termin Di Kota Banda Aceh JD Muthia, CZ Oktaviani, AT Bulba JUTEKS (Jurnal Teknik Sipil) 8 (1), 50-56, 2023 | | 2023 |
Faktor Keterlambatan Proses Pengadaan Tanah Terhadap Pencapaian Kinerja Proyek Strategis Nasional (PSN) Jaringan Irigasi Aceh AT Bulba, CZ Oktaviani Teras Jurnal: Jurnal Teknik Sipil 13 (1), 245-252, 2023 | | 2023 |
Analisis Faktor-Faktor Yang Mempengaruhi Triple Constraints Proyek Konstruksi Gedung Di Provinsi Aceh Dalam Masa Pandemi Covid 19 TA Billah, A Abdullah, AT Bulba Teras Jurnal: Jurnal Teknik Sipil 13 (1), 99-112, 2023 | | 2023 |
The risk occurrence index to the operational of construction consultant during pandemic Covid-19 M Mubarak, CZ Oktaviani, M Mahmuddin, AT Bulba AIP Conference Proceedings 2613 (1), 2023 | | 2023 |
IDENTIFIKASI RISIKO BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BAGI PERUSAHAAN KONTRAKTOR AT Bulba, A Rauzana, I Kurniawan Jurnal Teknik Sipil dan Teknologi Konstruksi 8 (2), 121-132, 2022 | | 2022 |
Implementation of Quality Management System Performance by Batching Plant Service Provider in Kabupaten Aceh Besar HC Nst, CZ Oktaviani, AT Bulba Journal of World Science 1 (9), 725-736, 2022 | | 2022 |
The correlation of financial risk variables on project construction budget infrastructure in Aceh I Kurniawan, A Rauzana, AT Bulba AIP Conference Proceedings 2453 (1), 2022 | | 2022 |
IDENTIFIKASI RISIKO OLEH PENGEMBANG PERUMAHAN DI KOTA BANDA ACEH DAN KABUPATEN ACEH BESAR N Malahayati, AT Bulba Journal of The Civil Engineering Student 3 (3), 301-308, 2021 | | 2021 |
FAKTOR DOMINAN PENENTUAN PEMENANG LELANG PADA SISTEM GUGUR DI KOTA BANDA ACEH AT Bulba, MZ Fahlewi Jurnal Teknik Sipil 3 (2), 191-198, 2014 | | 2014 |
Analysis of Causes of Human Errors in Construction Projects A Rauzana, TA Ariefsyah, AT Bulba | | |