Follow
Akhirini
Akhirini
Universitas Tridinanti
Verified email at univ-tridinanti.ac.id
Title
Cited by
Cited by
Year
Identification of Risk Factors for The Implementation Stage of Toll Road Construction in Public-private Cooperation Using the BOT (Build Operate Transfer) System
A Akhirini, ZF Umari
Journal Of Civil Engineering Building And Transportation 7 (1), 146-150, 2023
52023
Produktivitas Dan Efektivitas Alat Berat Pada Pekerjaan Lapis Pondasi Proyek Rehabilitasi Jalan
A Firda, B Asmawi, Akhirini, D Parlaungan
Jurnal Deformasi 8 (1), 100-110, 2023
22023
PRODUKTIVITAS PEKERJA DENGAN MENGGUNAKAN METODE WORK SAMPLING (PEKERJAAN PEMASANGAN TIANG PANCANG)
A Firda, Hanafiah, Akhirini
LATERAL: Jurnal Teknik Sipil 1 (1), 15-25, 2023
22023
ANALISIS PENJADWALAN WAKTU MENGGUNAKAN METODE CPM DAN PERT PADA PEMBANGUNAN GUDANG DEXA MEDICA PALEMBANG
LR Lubis, ZF Umari, K Kristi, A Akhirini
Jurnal Teknik Sipil LATERAL 1 (2), 21-30, 2023
2023
IDENTIFIKASI DAN ANALISIS RISIKO PENGEMBANGAN INFRASTRUKTUR JALAN TOL DENGAN SISTEM BOT (BUILD OPERATE TRANSFER)
Akhirini
Institut Teknologi Bandung, 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–5