Factor analysis on causal of construction claims and disputes in Indonesia (with reference to the construction of hydroelectric power project in Indonesia) S Hardjomuljadi International Journal of Applied Engineering Research 9 (22), 12421-12445, 2014 | 38 | 2014 |
Analisis Faktor Keterlambatan Dimulainya Pelaksanaan Proyek Konstruksi pada Model Kontrak Rancang Bangun AM Alaydrus, S Hardjomuljadi Konstruksia 10 (1), 95-116, 2019 | 34 | 2019 |
Use of dispute avoidance and adjudication boards S Hardjomuljadi Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2020 | 26 | 2020 |
Analisis faktor penyebab klaim pada proyek konstruksi yang menggunakan FIDIC conditions of contract for plant and design build GA Taurano, S Hardjomuljadi Konstruksia 5 (1), 2013 | 26 | 2013 |
Strategi klaim konstruksi berdasarkan FIDIC conditions of contract S Hardjomuljadi, A Abdulkadir, M Takei Jakarta: Pola Grade, 2006 | 21 | 2006 |
Project risk management in hydropower plant projects: A case study from the state-owned electricity company of Indonesia WB Sudirman, S Hardjomuljadi Journal of Infrastructure Development 3 (2), 171-186, 2011 | 19 | 2011 |
Alternatif penyelesaian sengketa konstruksi di Indonesia S Hardjomuljadi Bandung: Logoz Publishing, 2016 | 16 | 2016 |
Buku Kedua: Manajemen Klaim Konstruksi FIDIC Conditions of Contract S Hardjomuljadi Bandung: Logoz Publishing, 2015 | 16 | 2015 |
Indonesia position in the globalization of construction industry P Kesai, R Soegiarso, S Hardjomuljadi, MI Setiawan, D Abdullah, ... Journal of Physics: Conference Series 1114 (1), 012133, 2018 | 15 | 2018 |
Penyebab dan dampak Variation Order (VO) pada pelaksanaan proyek konstruksi A Nurmala, S Hardjomuljadi Konstruksia 6 (2), 2015 | 14 | 2015 |
Analisis faktor penyebab keterlambatan pembayaran kontraktor kepada subkontraktor pada proyek gedung bertingkat N Listanto, S Hardjomuljadi Konstruksia 10 (1), 59-72, 2019 | 13 | 2019 |
Metode Building Information Modeling 5d Untuk Meminimalkan Klaim Konstruksi Yang Ditimbulkan Oleh Penyedia Jasa SA Noviani, M Amin, S Hardjomuljadi Konstruksia 13 (1), 29-42, 2022 | 11 | 2022 |
Peran penilai ahli dalam penanganan kegagalan bangunan dan kegagalan konstruksi (menurut UU No 18 tahun 1999 jo PP 29 tahun 2000) S Hardjomuljadi Konstruksia 6 (1), 2017 | 11 | 2017 |
Variation order, the causal or the resolver of claims and disputes in the construction projects S Hardjomuljadi International Journal of Applied Engineering Research 11 (14), 8128-8135, 2016 | 11 | 2016 |
Analisis “Extension of Time” dan Dampaknya pada Kontrak Konstruksi (FIDIC Conditions of Contract MDB Harmonised Edition) S Hardjomuljadi Konstruksia 5 (2), 2014 | 10 | 2014 |
The most influencing factors on the causes of construction claims and disputes in the EPC contract model of infrastructure projects in Indonesia S Hardjomuljadi, H Sulistio Rev Int Geogr Educ Online 11, 80-91, 2021 | 8 | 2021 |
Faktor Kendala Dominan Penggunaan E-Catalogue Pada Proses Pengadaan Proyek Konstruksi Jalan Dengan Metoda SPSS & RII Y Malinda, S Hardjomuljadi vol 7, 90-105, 2019 | 8 | 2019 |
The effect of contract change order on contractor financing in government projects AY Martanti, S Hardjomuljadi International Journal of Civil Engineering and Technology 9 (6), 665-671, 2018 | 8 | 2018 |
Buku Kesatu: Pengantar Kontrak Konstruksi FIDIC Conditions of Contract S Hardjomuljadi Bandung: Logoz Publishing, 2014 | 8 | 2014 |
Analisis Pembagian Tanggung Jawab Pada Proyek Kerja Sama Operasi Terhadap Subkontraktor (Studi Proyek Enam Ruas Tol Dalam Kota Kelapa Gading-Pulo Gebang) MRA Ready, S Hardjomuljadi Konstruksia 10 (2), 1-20, 2019 | 7 | 2019 |