Kiki Kananda
Kiki Kananda
Institut Teknologi Sumatera
Verified email at itera.ac.id
Title
Cited by
Cited by
Year
Konsep pengaturan aliran daya untuk PLTS tersambung ke sistem grid pada rumah tinggal
K Kananda, R Nazir
Jurnal Nasional Teknik Elektro 2 (2), 65-71, 2013
252013
Optimization active and reactive power flow for PV connected to grid system using Newton Raphson method
R Nazir, K Kanada, P Coveria
Energy Procedia 68, 77-86, 2015
92015
High absorbance performance of symmetrical split ring resonator (SRR) terahertz metamaterial based on paper as spacer
HT Yudistira, LY Ginting, K Kananda
Materials Research Express 6 (2), 025804, 2018
72018
A Studi Awal Potensi Energi Surya Wilayah Lampung
K Kananda
journal of science and applicative technology 1 (2), 75-81, 2017
32017
Potential Analysis of Hydro Power Plants in Pesisir Barat District, Lampung Province
K Kananda, D Corio, H Aziz, A Diah
Journal of Science and Applicative Technology 2 (1), 100-106, 2019
22019
Tunable terahertz metamaterial absorber by using graphene for tailoring absorbing performance
HT Yudistira, LY Ginting, K Kananda
Materials Research Express 6 (4), 045804, 2019
22019
A Preliminary Study of Microwave Metamaterial Absorber Base on Cross-shaped for Stealth Technology
HT Yudistira, K Kananda
2019 IEEE Student Conference on Research and Development (SCOReD), 157-160, 2019
12019
The effect of cross-shaped line width on the absorbance performance of terahertz metamaterial based on paper as spacer
HT Yudistira, LY Ginting, K Kananda
IOP Conference Series: Earth and Environmental Science 258 (1), 012048, 2019
12019
Investigation of a Metamaterial Absorber with a Ground Plane by Impedance Analysis
HT Yudistira, K Kananda
Journal of Electronic Materials, 1-8, 2020
2020
PERBANDINGAN PENEMPATAN PANEL FOTOVOLTAIK DI ATAS TANAH (GROUND MOUNTING PV) ATAU DI ATAS ATAP (ROOFTOP PV) SEBAGAI IMPLEMENTASI PEMANFAATAN PLTS YANG EFISIEN DI ITERA
S Baqaruzi, K Kananda, A Muhtar
Jurnal Elektro 13 (1), 31-38, 2020
2020
Analysis of Generating Pico Hydro Power Plants (PLTPH) Case Study: Reservoir E Institut Teknologi Sumatera
D Corio, K Kananda, KS Suhaimi, H Aziz
IOP Conference Series: Earth and Environmental Science 537 (1), 012029, 2020
2020
Simulation of Turbines Design For Hidropower In Way Laai and Way Lami Pesisir Barat District, Lampung Province
K Kananda, EMS Dean Corio
Jurnal ECOTIPE 7 (1), 2020
2020
TURBINES DESIGN FOR HIDROPOWER IN WAY LAAI AND WAY LAMI PESISIR BARAT DISTRICT LAMPUNG PROVINCE
K Kananda, D Corio
Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and …, 2020
2020
Analisis potensi energi matahari di Institut Teknologi Sumatera: Pertimbangan Faktor Kelembaban dan Suhu
MS Anrokhi, MY Darmawan, A Komarudin, K Kananda, DL Puspitarum
Journal of Science and Applicative Technology 3 (2), 89-92, 2019
2019
Analisa Potensi Embung Itera Sebagai Pembangkit Listrik Tenaga Pico Hydro (PLTPH)
D Corio, K Kananda
Jurnal Nasional Teknik Elektro 8 (3), 97–103, 2019
2019
Forecasting Load on PT PLN (Persero) Metro Substations (GI) Using Combined Methods for Electrical Needs in Metro City 2019-2029
C Saigustia, K Kananda
Electrician 13 (2), 43-48, 2019
2019
Desain dan Analisa Kelayakan PV-Diesel-Grid Sistem Hibrid di Institut Teknologi Sumatera (ITERA)
R Asri, K Kananda
Jurnal Elektro 3 (2), 67-72, 2018
2018
Control of Solar Power Plants Connected Grid with Simple Calculation Method on Residential Homes
K Kananda, R Nazir
E&ES 97 (1), 012015, 2017
2017
Perancangan Modifikasi Antena Kupu–Kupu Panjang Dual Frekuensi untuk Aplikasi Hypherthermia
K Kananda, H Andre, AR Timor, Z Hendri
Jurnal Nasional Teknik Elektro 4 (2), 207-214, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–19