Rasio Lebar Dan Tinggi Balok Terhadap Kuat Lentur AM Indriani, A Sugianto INFO-TEKNIK 17 (2), 219-234, 2016 | 8 | 2016 |
Behavior of filled and encased composite column using 3D numerical modelling ANSYS S Taufik, G Utomo, A Sugianto International Journal of Composite Materials 8 (1), 18-23, 2018 | 4 | 2018 |
Analisis Penggunaan Batu Split Long Ikis Terhadap Karakteristik Campuran AC-WC (Asphal Choncrete-Wearing Course) AM Indriani, A Sugianto, F Faisal JTT (Jurnal Teknologi Terpadu) 3 (2), 2015 | 4 | 2015 |
Numerical Modelling Behaviour of Reinforced Concrete Deep Beam with Strut-and-Tie Model A Sugianto, S Taufik Int. J. Mech. Appl 9, 1-9, 2019 | 2 | 2019 |
Pengaruh Rasio Tinggi Blok Tegangan Tekan Dan Tinggi Efektif Terhadap Lentur Balok Bertulangan Tunggal A Sugianto, AM Indriani JTT (Jurnal Teknologi Terpadu) 5 (1), 100-107, 2017 | 2 | 2017 |
Analysing Numerical Modelling Behaviour of Reinforced Concrete Deep Beam with Strut-and-Tie Model S Taufik, A Sugianto New Approaches in Engineering Research Vol. 12, 17-34, 2021 | 1 | 2021 |
Kajian Percepatan Proyek dengan Metode Time Cost Trade Off pada Proyek Pembangunan Jalan Tol Balikpapan-Samarinda Seksi V: Acceleration of Project Using the Time Cost Trade off … R Respati, A Sugianto, WB Santoso Jurnal Ilmiah Teknik Sipil TRANSUKMA 3 (2), 142-153, 2021 | 1 | 2021 |
Analysis of offshore platforms lifting with fixed pile structure type (fixed platform) based on ASD89 A Sugianto, AM Indriani AIP Conference Proceedings 1903 (1), 2017 | 1 | 2017 |
Analisis Perbandingan Biaya Pekerjaan Rangka Atap Baja Ringan Dengan Rangka Atap Kayu A Sugianto, AM Indriani Jurnal Ilmiah Teknik Sipil TRANSUKMA 2 (1), 16-23, 2016 | 1 | 2016 |
Mengatasi Limpasan Banjir Dengan Normalisasi Saluran Drainase Di Kelurahan Baru Ilir Kota Balikpapan S Sulardi, L Lukman, NK El Ridlo, A Sugianto, G Utomo Abdimas Universal 3 (1), 44-49, 2021 | | 2021 |
Analisa Percepatan Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek TA BPP I RU V Balikpapan: Time Acceleration and Cost Analysis with ime Cost Trade Off Method in … A Sugianto, HM Sari, S Airunisa Jurnal Ilmiah Teknik Sipil TRANSUKMA 3 (1), 52-64, 2020 | | 2020 |
Pemasangan Saluran Drainase Pipa Buis Beton di Tanah Lunak Menggunakan Pondasi Kacapiring S Sulardi, A Sugianto, W Marthanto Abdimas Universal 2 (2), 82-85, 2020 | | 2020 |
ANALISIS PENGURANGAN TIE-BEAM SEBAGAI OPTIMALISASI WAKTU PELAKSANAAN PEKERJAAN STRUKTUR PROYEK TERMINAL BANDARA SEPINGGAN BALIKPAPAN A Sugianto Teknologi Sipil: Jurnal Ilmu Pengetahuan dan Teknologi, 2019 | | 2019 |
PORTAL BAJA OPEN FRAME SEBAGAI METODE PENANGANAN DELEKSI PIPA RAW WATER SUNGAI WAIN AREA BANGUNAN BENDALI REFINERY UNIT V BALIKPAPAN A Sugianto PORTAL 1 (1), 2018 | | 2018 |
ANALISIS EXTENSION DECK ANJUNGAN LEPAS PANTAI SEPINGGAN RAJAH A Sugianto, AM Indriani Jurnal Ilmiah Teknik Sipil TRANSUKMA 1 (02), 139-149, 2016 | | 2016 |
Pengaruh Diameter Sengkang Terhadap Kuat Geser Balok Dengan Variasi Diameter Tulangan Sengkang 6mm, 8 Mm Dan 10 Mm A Sugianto, AM Indriani JTT (Jurnal Teknologi Terpadu) 4 (1), 2016 | | 2016 |
Pengaruh Luas Lubang Pipa Pada Kolom Pendek Dengan Variasi Diameter Lubang Pipa 1˝”, 2”, 2˝” Dan 3”. A Sugianto, AM Indriani, I Husein JTT (Jurnal Teknologi Terpadu) 3 (2), 2015 | | 2015 |