Follow
Dyah Ika Rinawati
Title
Cited by
Cited by
Year
Penentuan waktu standar dan jumlah tenaga kerja optimal pada produksi batik cap (Studi Kasus: IKM Batik Saud Effendy, Laweyan)
DI Rinawati, DP Sari, F Muljadi
J@ ti Undip: Jurnal Teknik Industri 7 (3), 143-150, 2013
1002013
Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (Oee) Dan Six Big Losses Pada Mesin Cavitec Di PT. Essentra Surabaya
DI Rinawati, NC Dewi
Prosiding Snatif, 21-26, 2014
782014
The effect of green purchase intention factors on the environmental friendly detergent product (Lerak)
BP Nia, IR Dyah, S Hery, DS Bayu
E3S Web of Conferences 73, 06007, 2018
442018
Analisis Penerapan Total Productive Maintenance (Tpm) dengan Perhitungan Overall Equipment Efectiveness (Oee) dan Six Big Losses Mesin Cavitec PT. Essentra Surabaya (Studi …
NC Dewi, DI Rinawati
Industrial engineering online Journal 4 (4), 2015
422015
Pengukuran Tingkat Eko-efisiensi Menggunakan Life Cycle Assessment untuk Menciptakan Sustainable Production di Usaha Kecil Menengah Batik
DP Sari, S Hartini, DI Rinawati, TS Wicaksono
Jurnal Teknik Industri 14 (2), 137-144, 2012
372012
The role of internal and external drivers for successful implementation of GSCM practices
A Susanty, DP Sari, DI Rinawati, L Setiawan
Journal of Manufacturing Technology Management 30 (2), 391-420, 2019
362019
Analisis Identifikasi Bahaya Kecelakaan Kerja Menggunakan Job Safety Analysis (Jsa) Dengan Pendekatan Hazard Identification, Risk Assessment and Risk Control (Hirarc)(Studi …
MC Hidayat, M Nuruddin
JUSTI (Jurnal Sistem Dan Teknik Industri) 2 (4), 557-569, 2022
332022
Pengelolaan produksi menggunakan pendekatan lean and green untuk menuju industri batik yang berkelanjutan (Studi kasus di UKM Batik Puspa Kencana)
DI Rinawati, DP Sari, SN WP, F Muljadi, SP Lestari
J@ TI Undip: Jurnal Teknik Industri 8 (1), 43-50, 2013
252013
Eco-efficiency analysis of furniture product using life cycle assessment
DI Rinawati, DP Sari, AC Prayodha
E3S Web of Conferences 31, 08005, 2018
222018
Rancang Bangun Sistem Informasi Bantuan Logistik Bencana Studi Kasus Pada Bpbd Kabupaten Magelang
DI Rinawati, DP Sari, F Priatamphatie, F Fahrudin
J@ ti Undip: Jurnal Teknik Industri 13 (1), 51-60, 2018
172018
Policy making for GSCM implementation in the wooden furniture industry: a DEMATEL and system dynamics approach
A Susanty, DP Sari, DII Rinawati, R Purwaningsih, FH Sjawie
Management of Environmental Quality: An International Journal 30 (5), 925-944, 2019
162019
Barriers of reverse logistics implementation: A case study in a car battery industry in Indonesia
DP Sari, MM Ulkhaq, DI Rinawati, DR Rasyida
Int. J. Supply Chain Manag 7 (5), 53-67, 2018
132018
Analisis Pengaruh Faktor Green Purchase Intention Terhadap Produk Detergen Ramah Lingkungan (Lerak) Menggunakan Metode Linear Regression
BD Sutrisno, NBP Sari, DI Rinawati
Industrial Engineering Online Journal 6 (4), 2018
132018
Analisa Penerapan 5s (Seiri, Seiton, Seiso, Seketsu, Shitsuke) Pada Area Warehouse Cv Sempurna Boga Makmur Semarang
M Kartika, DI Rinawati
Industrial Engineering Online Journal 5 (4), 2016
132016
Integrasi Metode Analytical Network Process (Anp) Dan Technique for Others Preference by Similarity to Ideal Solution (Topsis) Dalam Menentukan Prioritas Supplier Bahan Baku …
DI Rinawati, MIT Handoko
Jati Undip 10 (1), 7-18, 2015
112015
Life-cycle assessment of hydrogen utilization in power generation: A systematic review of technological and methodological choices
DI Rinawati, AR Keeley, S Takeda, S Managi
Frontiers in Sustainability 3, 920876, 2022
92022
A systematic review of life cycle assessment of hydrogen for road transport use
DI Rinawati, AR Keeley, S Takeda, S Managi
Progress in Energy 4 (1), 012001, 2021
92021
Perencanaan Persediaan Bahan Baku Semen Dengan Menggunakan Metode Material Requirement Planning (Mrp) Pada PT Indocement Tunggal Prakarsa Tbk. Plant Cirebon
WAY Bunga, DI Rinawati
Industrial Engineering Online Journal 7 (4), 2019
92019
Impact of internal driver on implementation of GSCM practice
A Susanty, DP Sari, DI Rinawati, L Setiawan
International Conference on Industrial Engineering and Operations Management …, 2018
92018
Implementasi Software ERP Odoo 8 di Warehouse PT Apparel One Indonesia Semarang
AC Prayodya, DI Rinawati
Industrial Engineering Online Journal 6 (2), 2017
92017
The system can't perform the operation now. Try again later.
Articles 1–20