Follow
ZAENAL ARIFIN
ZAENAL ARIFIN
Universitas Riau Kepulauan
Verified email at ft.unrika.ac.id
Title
Cited by
Cited by
Year
Analysis of Overall equipment effectiveness (OEE) on engine power plant performance
D Nusraningrum, Z Arifin
KnE Social Sciences, 2018
122018
Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Untuk Meminimalkan Kecelakaan Kerja Dengan Metode Fault Tree Analysis Di Pt. Sumber Sukses Ganda
Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 10 (1), 68-76, 2022
62022
Pengendalian Kualitas Dengan Metode Nominal Group Teknology (NGT) dan Poka-Yoke untuk Mengurangi Jumlah Cacat Panel Assy di PT. XYZ
Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 7 (2), 76-85, 2019
52019
Analisa Dan Desain Sistem Informasi Manajemen Dengan Metode SDLC (System Development Life Cycle) Guna Mengurangi Waktu Kerusakan Mesin Welding
S Rahmadani, Z Arifin, E Sumarya
PROFISIENSI: Jurnal Program Studi Teknik Industri 7 (1), 16-24, 2019
52019
Analisa Dan Desain Sistem Informasi Manajemen Dengan Metode Sdlc (System Development Life Cycle) Guna Mengurangi Waktu Kerusakan Mesin Welding
SR Rahadani, Z Arifin, E Sumarya
PROFISIENSI: Jurnal Program Studi Teknik Industri 9 (2), 291-297, 2021
42021
Perancangan Ulang Tata Letak Stasiun Kerja Dengan Metode Systematic Lay Out Planning (Studi Kasus di PT. Infineon Technologies Batam)
P Rahardjo, Z Arifin, A Purbasari
PROFISIENSI: Jurnal Program Studi Teknik Industri 2 (2), 2014
42014
MENURUNKAN JUMLAH KECACATAN PRODUK PADA PROSES PRODUKSI DENGAN MENGGUNAKAN METODE SIX SIGMA DAN PENGENDALIAN STATISTIK DI PT. XYZ INDONESIA
Z Arifin, BD Leonanda
Sigma Teknika 4 (1), 106-114, 2021
3*2021
Program Training Pengembangan Kewirausahaan Untuk Meningkatkan Kemampuan Pengelolaan Bisnis Usaha Kecil dan Menengah (UKM)
Z Arifin
SIGMA TEKNIKA 2 (1), 57-67, 2019
32019
Pengendalian Reject Contamination On Marking Pada Proses Mark Scan Pack (Msp) Dengan Pendekatan Six Sigma (Studi Kasus Di Pt. Infineon Technologies Batam) The Control Of Reject …
IRP Siallagan, D Redantan, Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 4 (1), 2016
32016
Learning Material Analysis of Motorcycle Engine Tune-Up Practice Competency of Vocational High School Students
S Hartanto, ZA Handoko, A Huda, R Fordiana, N Yeni
International Journal of Recent Technology and Engineering (IJRTE). ISSN …, 2019
22019
PENJADWALAN PRODUKSI SPEAKER DENGAN PENDEKATAN HEURISTIC DISPATCHING RULE DI STATION DOUBLE RE UNTUK MENGOPTIMALKAN WAKTU ALIR RATA-RATA di PT. ABC
Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 9 (2), 262-270, 2021
12021
PENERAPAN SISTEM GMP (GOOD MANUFACTURING PRACTICE) DAN SPC (STATISTICAL PROCESS CONTROL) PADA PROSES PRODUKSI UNTUK MENINGKATKAN KUALITAS KERUPUK KETUMBAR (DI UKM KERUPUK BERKAH)
S Ayu, A Merjani, Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 7 (1), 46-54, 2019
12019
Motor Cycle Tune-Up Learning Material Based on Industrial Competency for Vocational High School
H Handoko, Z Arifin, A Huda, R Fordiana, N Yeni
Asia Proceedings of Social Sciences 2 (4), 38-42, 2018
12018
Pengendalian Reject Chip Chasing Di Ic Pada Proses Trim and Form Dengan Pendekatan Doe (Study Kasus Di PT. Infineon Technologies Batam) Control of Reject Chip Chasing in Ic …
L Oppusunggu, Z Arifin, A Merjani
PROFISIENSI: Jurnal Program Studi Teknik Industri 4 (2), 2016
12016
PERANCANGAN ALAT PEMISAH MINYAK GORENG UNTUK MENINGKATKAN KUALITAS KERIPIK SINGKONG DENGAN METODE QFD DI UKM NAFISAH
VM Afma, Z Arifin
SIGMA TEKNIKA 3 (2), 132-138, 2020
2020
Analysis of Learning Material on 4-Stroke Engine Tune-Up Practice of Motorcycle Engineering
S Hartanto, Z Arifin
KnE Social Sciences, 25–35-25–35, 2019
2019
Perencanaan Kebutuhan Luas Lahan pada Tata Letak Fasilitas Area Pelayanan Proses di Alya Jaya Motor
RE Putri, H Irwan, Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 2 (1), 2014
2014
Efisiensi Pemakaian Air Pada Proses Reverse Osmosis Dengan Menggunakan Rekayasa Nilai Di Pt. excelitas Technologies Batam
I Imran, D Redantan, Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 2 (1), 2014
2014
Mengurangi Keterlambatan Pada Proyek Pembuatan Cargo Barge 300'(studi Kasus Pt. sekar Permata Nusa)
E Setioko, D Redantan, Z Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 1 (1), 2013
2013
Perbaikan Tata Letak Penyimpanan Gas Untuk Efektifitas Dan Efisien (Studi Kasus PT. Putra Nusa Jaya Sejati)
A Meiliudin, N Cundara, ZA Arifin
PROFISIENSI: Jurnal Program Studi Teknik Industri 1 (1), 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–20